Friday, June 14, 2013

My Water Way @ Punggol 2 - 榜鹅水道二

The Straits Times dated Thursday, May 16, 2013 page A8 by Priscilla Kham. ST's Run in the Park offers a workout close to nature. The Straits Time is organising a run at the Punggol waterway on 25 August 2013. The Straits Times run in the park promises participants an invigorating trail through the Punggol Waterway park connector , which is part of the North- eastern riverine loop. The loop goes round one of the most scenic places in Singapore. The Straits Times is partnering the National Parks Board (NPark), which is celebrating 50 Years of Greeting Singapore, for this event.
The Straits Times Run In The Park 2013 has 3 categories. The 5 km fun run, the 10km & 15km competition run. The registration fees are $46 and $55 per person respectively. ($42 & $ 50 per person for group of 4 and above). The goodies bag value from the event sponsors has far exceeded the registration fee.
UOB used to organise the annual Heart Beat run / walk at the Marina . Traditionally, the Start/Finish point was at UOB Plaza. For the year 2013 Heart Beat event, UOB has changed usual Marina route to a new location at the Punggol Water Way. It appears that more and more event organisers for the mass run have now diverted their attention to the Punggol Water Way for its scenic route.
I had stopped cycling at Punggol Water Way for quite a while due to wet weathers, personal commitments and physical illness - I was suffering from trigger finger illness recently.
The term trigger finger is used because when the finger unlocks, it pops back suddenly as if releasing a trigger on a gun. The disorder finger locking the tendon associated with the dysfunction and pain. Treatment is by way of injection of the tendon sheath with steroid. If injection fails, a simple surgical procedure can rectify the problem. The surgeon will cut the sheath that is restricting the tendon. I had my left hand 2nd last trigger finger surgery done in 2007 and coincidentally my right hand 2nd last finger was suffering from trigger finger illness 5 years later. The sugery of the right hand finger was done in August 2012.
Now that my trigger finger surgery had fully recovered,  I can go back to my regular sports activity( cycling at the  Punggol Water Way, tennis game and swimming). After laying off for so long, my bicycle required some minor maintenance job before I can ride on it.
- General cleaning
- Pump up the deflated tyres
- lubricate the moving parts and the lock

                                                                                         Operation wound is still raw


                                                    
                                                                                   Wound recovering after operation

                                                                                Punggol Water Way


                              

                                                                             Artist impression of  HDB flats
                                                                             along the Punggol Water Way
                 

                                                                                Water feature at Punggol Water Way


                                                                               HDB BTO flats with precast fascia

                                   

                                                                               Punggol Water Way beautiful scenery
                        


                                

                                  

                                                            HDB flats next to Punggol Water Way



                                            Construction of fly over 





                                             Bore piling works in progress





                                                      Completed HDB flats with LRT track



                                                      LRT station infront of HDB flats 



                                                         Tower cranes are important equipment 
                                     for the construction work  





                                                             Bridge near Punggol Water Town project 



                                                                              Hoisting of precast fascia beam
                                                                              by tower crane



                                                                              Design of building with precast fascia
                                                                              beams reduces labour force as compare
                                                                              to building with cast insitu members





                                                           Completed flats near Punggol Water Way





                                                          Tower cranes to facilitate construction  







                                                                                     Flats at Punggol Water Way fetch good value





                                        Beautiful scenery 



                                          My iron horse 我的铁马






No comments:

Post a Comment